More on the build. phase two
So this phase is the master bedroom and the QUEENS work room that I am not allowed in after the build is done. LOL but as you can see. we lined the floor with black plastic stapled in each row by lorie. then the insulation get put in and the deck put down we are still using the osb because I bought a ton of it at a great price. Shaine and Katy lent us some scaffolding which really was a big help because Chad and Lorie were out of the picture at the time
the master bedroom walls went up first
and then the QUEENS work roomSo despite all the problems we had over the summer, we managed to get in build enclosed and wrapped and tar paper on the roof and nailed down. Check out the end pics